Commissioned artefact
Control and record interfaces with integration tests.
Connect robot execution to production control and manufacturing records.
Commission this programmeConnect robot execution to production control and manufacturing records.
Control and record interfaces with integration tests.
Assess state agreement and failure recovery across the boundaries between robot, controller and business system.
Connect robot execution to production control and manufacturing records. The workcell, equipment interfaces and physical task determine the engineering scope and acceptance requirements.
Connect robot task execution to production control and manufacturing records. The commissioned output includes control and record interfaces with integration tests.
Assess state agreement and failure recovery across the boundaries between robot, controller and business system. The engagement defines the baseline, task scope and evidence used to assess the resulting contribution.
Bring the next
requirement.